Our aerospace client in Indianapolis, IN needed to update their waste water treatment facility with new controls and instrumentation.
Dynamic Engineering Design prepared panel design drawings for a new controller at the wastewater treatment building and for remote I/O at the retention pond. Field wiring design drawings for the connection of motor operated valves, pH, solids meter, level, flow meter, and sump pump at the retention pond were provided as well as plan drawings and notes for the installation of the fiber optic run from the wastewater facility to the retention pond.
Construction management was provided and consisted of preparing and issuing the bid package, scope of work, detailed design documents, and the required general conditions. Facilitation of the pre-bid meeting, walk-thru, bidding process, and publication of addendums was furnished by Dynamic Engineering Design along with bid verification and reviews.